SDETERS
Agricultural
- May 1, 2008
- 1,282
I have the following parts modeled in NX
1. PRT file with Raw material cast iron with a master drafting drawing.
2. PRT file with wave link back to File 1 cast iron with machining subtract cut features to the wave link solid body of the cast iron part with a master drafting drawing.
3. PRT file assembly which I used for the Wavelink that contains parts 1 and 2.
Now I want new items of all files and to keep my Wavelinks and drawings attached in the new files like they where in the original file.
I want the wave link to be with the new cast iron raw material to the new cast iron machining.
We are using teamcenter.
What is the proper steps or did I mess this entire process up? Do I have to delete the Wavelinks and recreate them?
Is there a better process?
Thanks
1. PRT file with Raw material cast iron with a master drafting drawing.
2. PRT file with wave link back to File 1 cast iron with machining subtract cut features to the wave link solid body of the cast iron part with a master drafting drawing.
3. PRT file assembly which I used for the Wavelink that contains parts 1 and 2.
Now I want new items of all files and to keep my Wavelinks and drawings attached in the new files like they where in the original file.
I want the wave link to be with the new cast iron raw material to the new cast iron machining.
We are using teamcenter.
What is the proper steps or did I mess this entire process up? Do I have to delete the Wavelinks and recreate them?
Is there a better process?
Thanks