developmentPE
Civil/Environmental
- Aug 25, 2010
- 3
We are getting ready to file a NOT with the NYSDEC. We were performing stormwater inspections up until now; my question is do we still need to continue performing these inspections now that the NOT is filed or does the NOT signify the complete end of inspector's needs as well?
Thanks