Dear All,
I need your feedback regarding any specific offshore criteria available in good design practice which tends to request the designed to consider less buffer time for sizing the utilities vessels (IA, PA and N2 receiver vessels) on offshore Jetty platforms. Would there be any structural limitation in restricting the designed from following the standard onshore 15-20 minutes time typically considered for sizing similar systems.
Thanks
Regards,
I need your feedback regarding any specific offshore criteria available in good design practice which tends to request the designed to consider less buffer time for sizing the utilities vessels (IA, PA and N2 receiver vessels) on offshore Jetty platforms. Would there be any structural limitation in restricting the designed from following the standard onshore 15-20 minutes time typically considered for sizing similar systems.