Offshore pipeline installation start-up 1

Status
Not open for further replies.

ek4putr4

Mechanical
May 2, 2008
43
Dear all,

What is the pros and cons of using single cable mooring attached to one of the platform jacket leg for start-up of offshore pipeline laying?
 
Replies continue below

Recommended for you

Pros:
1] Easy to install
2] Flexible to manoveure the barge
3] Easy to connect the fuse soft rope

Cons:
1] Too much load at one point on the jacket leg
2] Larger tolerance on the target point
3] Target point would much away from the jacket base requiring longer riser tie-in spool
4] Most operators would not allow

Narendranath R
Pipeline engineering is made easy with state of the art computer software, visit
 
tx naren,

is there any bad effect to the linepipe itself, i.e. stress, span length, fatigue, etc. ?
 
ek4putr4... it should be calculated when you do your stinger and offramp calcs
 