pimheinkool
Mining
- Apr 18, 2000
- 11
An old tailings dump is reclaimed using high pressure hydraulic monitoring. The slurry is being processed in an acid leaching plant. The remaining tailings are pumped to a newly constructed tailings facility (new tailings dam). Preliminary hydrogeological studies indicate a possible leakage of 2,000 m3/day at the new tailings facility. To me, this seems quite a lot. What is your opinion about this? Many thanks in advance, Pimhein Kool