Geotechnical76
Civil/Environmental
- Aug 22, 2003
- 36
Does any one have experience with the open cell steel sheetpiles with Soldier piles and anchors? I attached a figure that shows the problem. My main questions:
1-What is the min/max required radius to develop the hoop stresses/tensions in the sheetpiles? for example, if we have a straight line, hoop stresses can not be assumed.
2-What is the min/max required height of the wall to develop the hoop stresses/tensions in the sheetpiles?
3-Do you know of any design example/manual that explains the design procedure in details for this particular problem. I know that there are many cellular cofferdam publications but none shows an example or a design guide for such structures.
Thanks.
1-What is the min/max required radius to develop the hoop stresses/tensions in the sheetpiles? for example, if we have a straight line, hoop stresses can not be assumed.
2-What is the min/max required height of the wall to develop the hoop stresses/tensions in the sheetpiles?
3-Do you know of any design example/manual that explains the design procedure in details for this particular problem. I know that there are many cellular cofferdam publications but none shows an example or a design guide for such structures.
Thanks.