Does anyone have any information on or a reference for the minimum length of soil plug in order for the entire pile tip area (including the plug) to be used in calculating the point bearing capacity of the pipe pile? The open end pipe pile will be driven through soft organic silt, through a sand layer, to a very dense sand, gravel, rock fragment stratum where it will achieve its capacity almost immediately (but not before).