lejam
Structural
- Mar 30, 2013
- 54
A building was designed for 3 storeys with concrete roof slab. What if the beams and slabs of the roofslab won't be put yet but the 3 meter columns already arise that is open ended (without any beam connections on top of it). Is there any bad effects for this?