Steel Inspector
Structural
- Jun 20, 2021
- 45
Hello,
I have a RC dome that have around 36 openings. these openings are located at three levels, 12 openings at each level.
my concern is that these openings will cut some of the reinforcement steel. it will cut one-third of the reinforcement at the first level ( closest to support ), and will cut half at the third level ( closest to dome tip ).
any thoughts?
also if you can sketch an approximate bending moment and shear diagrams to help me define the most critical area of the dome where failure will most likely occur.
( attached are dome architectural and structural drawings
I have a RC dome that have around 36 openings. these openings are located at three levels, 12 openings at each level.
my concern is that these openings will cut some of the reinforcement steel. it will cut one-third of the reinforcement at the first level ( closest to support ), and will cut half at the third level ( closest to dome tip ).
any thoughts?
also if you can sketch an approximate bending moment and shear diagrams to help me define the most critical area of the dome where failure will most likely occur.
( attached are dome architectural and structural drawings