I need some help to figure out how to do some calculations correctly.
I have made a RBD and then I want to calculate the MTBF and the availability using exponential failure rate.
Ok, so far so good but what I don't get is the difference when changing operation time or using percentage of duty time.
Let's say the operation time is 700 h. I make a calculation and then let's say the MTBF for the system is 200 000 h. If I then let this system be active 50 % during the operation time instead of 100% how should this be done correctly?
I can then use percentage of duty time and specify that out of these 700 h my system is active 50 % of the time (every single part of the rbd is set to 50%). The result is that the MTBF is 400000 h. The calculations are made for 700 h.
I also thought I could use the fact that if I know the operation time is 700 h and if the system then is active 50% of this time this would be the same that to say that system is active 100% in 350 h. However if I do that then the result is MTBF 200000 h.
So I guess I'm doing something wrong here... Can someone please help me out?
Thank you in advance.
I have made a RBD and then I want to calculate the MTBF and the availability using exponential failure rate.
Ok, so far so good but what I don't get is the difference when changing operation time or using percentage of duty time.
Let's say the operation time is 700 h. I make a calculation and then let's say the MTBF for the system is 200 000 h. If I then let this system be active 50 % during the operation time instead of 100% how should this be done correctly?
I can then use percentage of duty time and specify that out of these 700 h my system is active 50 % of the time (every single part of the rbd is set to 50%). The result is that the MTBF is 400000 h. The calculations are made for 700 h.
I also thought I could use the fact that if I know the operation time is 700 h and if the system then is active 50% of this time this would be the same that to say that system is active 100% in 350 h. However if I do that then the result is MTBF 200000 h.
So I guess I'm doing something wrong here... Can someone please help me out?