Dear All,
In the prepared shop drawings for steel reinforcement by supplier he did the following:
for columns, overlap in the middle of column
while in shear walls overlap at the bottom of verticals
The Slab is PT,
I do understand the for both columns and shear walls the zero moment will be at center, so why both have different overlap location.
The Tower is 60 Floors height
regards