Guest
i have recently came across a situation that a contractor was removing the wiring from the N/C contacts on a overload relay to the motor starter. He was then rewiring the contacts on the overload relay to provide a PLC an input, which then was used to shutdown the output. I am concerned with the use of a PLC to provide the shutdown of the motor in the case of an overload. Does anyone have any opions on this?