This is basically a MIN - MAX equation question relative to project-design-cost-efficiency.
`
Project is to design a basic structure onto which solar panels (1900 of them) can be attached, with cost being the primary focus. The footprint of the structure is 265' X 110'. The Solar Panels, Mounts, Wiring, etc. weigh in at just under 50lbs each. The minimum height for the 'solar lattice' is 12'.
`
Since there is no limitation on how often I can put vertical supports to hold this lattice in place...and since shorter span OWSJs are less costly, I wonder how often is just too often to have vertical pillars for the OWSJs? At what point is the cost of more 12' vertical supports outweighed by the reduction in OWSJ costs/span? At what point does this become shameless for a SE?
`
Any rules of thumb?
`
Project is to design a basic structure onto which solar panels (1900 of them) can be attached, with cost being the primary focus. The footprint of the structure is 265' X 110'. The Solar Panels, Mounts, Wiring, etc. weigh in at just under 50lbs each. The minimum height for the 'solar lattice' is 12'.
`
Since there is no limitation on how often I can put vertical supports to hold this lattice in place...and since shorter span OWSJs are less costly, I wonder how often is just too often to have vertical pillars for the OWSJs? At what point is the cost of more 12' vertical supports outweighed by the reduction in OWSJ costs/span? At what point does this become shameless for a SE?
`
Any rules of thumb?