asaldana
Structural
- Apr 13, 2005
- 5
I am analyzing a 2-Girder 90 foot span with train loading. The worst-case beam seems to work as I increase the tendons everywhere except for allowable stresses in the bottom flange from about 0.7L to Midspan. If I allow CONSPAN LA to "Auto Debond" the stress is decreased, but not enough. Any suggestion to manually input debonding lengths (maybe a good methodology) so that the span may work with only 2 girders with a reasonable amount of tendons.
Thanks, Any input is greatly appreciated - even if it is on p/s beam design with CONSPAN - am new at it.
ASaldana
Thanks, Any input is greatly appreciated - even if it is on p/s beam design with CONSPAN - am new at it.
ASaldana