I just want to some important/critical points on the subject:
The whole dispute we had on welding was the root pass for P91 for the first layer itself which should be 8 and above. However code allows after welding 1st layer PMI reading should be 7.2 and above.
ASME Section II part A calls for P91 material / ASME Section I PMI recommendation range from 7.2 minimum to 10.4 chrome content.
ASME section II part C calls for filler wire and electrode the minimum limit is 8 cr.
ASME AI is also particular to ensure filler wires used for P91 welding are in compliance to ASME code to certify the boiler. Boiler ASME stamping is the time when all records are verified afterwards they allow us to do the synchronization/power up.
My personal opinion based on the results about 1st layer which is low and past incidents on ESSAB copper coated is matching ( Not acceptable). Would like to know your help on this please.
Thank you
The whole dispute we had on welding was the root pass for P91 for the first layer itself which should be 8 and above. However code allows after welding 1st layer PMI reading should be 7.2 and above.
ASME Section II part A calls for P91 material / ASME Section I PMI recommendation range from 7.2 minimum to 10.4 chrome content.
ASME section II part C calls for filler wire and electrode the minimum limit is 8 cr.
ASME AI is also particular to ensure filler wires used for P91 welding are in compliance to ASME code to certify the boiler. Boiler ASME stamping is the time when all records are verified afterwards they allow us to do the synchronization/power up.
My personal opinion based on the results about 1st layer which is low and past incidents on ESSAB copper coated is matching ( Not acceptable). Would like to know your help on this please.
Thank you