Alpheus411
Civil/Environmental
- Mar 8, 2007
- 3
I am looking at a plan set where the entire roadway area (all very small local city owned roads in the southern US) is called out for a 'pavement overlay' of 1.5" of S-3 asphalt. On this same plan set some areas are also called out to have a 'leveling course' applied. (with a 1.5" minimum thickness specified) But since the entire area is to have the overlay applied, doesn't that make the leveling course part redundant? Since all these roads are badly potholed and missing large surface sections won't the contractor by necessity have to apply a leveling course of some sort before applying the 1.5" overlay anyway? I don't know much about paving so any thoughts would be helpful.