Dear All,
Can someone suggest me what to do with a broken PC Pile that has already been driven into 24 m depth?
The pile is broken at 2.5 m from the surface of soil. And we have to keep the elevation of the Pile at the surface of soil. What would be the best solution for the Pile?
If we connect the pile with the reinforcement bar and then pour concrete into it, is that OK?
Thanks.