our current design on site we have a chemical injection pump operating at high pressure.
we are intend to add a second train operating at low pressure, same pumps will be used.
on this low P, a PVC (with PIT) is being presented in the design, OPs team has challenged the design , under the pretext LP and HP will not work simultaneously.
any thoughts?
cheers
our current design on site we have a chemical injection pump operating at high pressure.
we are intend to add a second train operating at low pressure, same pumps will be used.
on this low P, a PVC (with PIT) is being presented in the design, OPs team has challenged the design , under the pretext LP and HP will not work simultaneously.
any thoughts?