pipertecho
Marine/Ocean
- Mar 16, 2011
- 9
firstly, sorry if this question duplicates with any of the previous threads. I did some quick search and didn't find any direct resemblance. I have a situation where a PD pump with approx duty point 14 m3/hr @ 1 bar needs to take Diesel oil suction from the two tanks (one of the tank placed in another compartment and pipe needs to climb up the wall). Planed pipe routing can be seen in image with its approx height, length dimensions. For this application, vendor proposed me a pump, which performance curves end/terminate before my duty point starts. The vendor is very confident on his pump selection based on duty point as well as NPSH and claiming that pump will work perfectly fine for my application. Honestly speaking, I am not very confident with this situation and hoping for support from the expert community