Hi everyone

Any PDA expert here? Is PDA reliable? Can someone please recommend any literature on PDA or any work examples to calculate pile soil resistance from PDA results?

I also came across this formula below. Quite a lot of questions popped into my head.

How was this formula derived? What do the 1st term force term and 2nd velocity x pile impedance represent? I understand that F(t1)can be obtained from the strain gauge attached near the top of the pile but how do I get this F(t1+2L/c) value? Why are two forces in the first term added, two velocities subtracted and divided by two?

Thanks for your sharing in advance

Screenshot_2022-07-26_160841_jyqz9p.png
 
Replies continue below

Recommended for you

Thanks, Geotechguy1

Yes, we'd get someone to do but just wanted to know the reliability and to have a bit of understanding of the test results submitted.
 
On some bigger projects I was involved in (think $20 billion mining projects with 20-50,000 20m long piles) during the investigation phase a program of test piles, static pile load tests, and PDA testing would be performed. Then during construction only PDA testing. Personally I don't think this is really necassary particularly if you are doing a large number of PDA tests (i.e. 5% PDA testing an 0 static load tests is in my opinion better than 2% PDA testing and 1 static load test). I have never been able to find any evidence of case histories where a failure occured because the capacity predicted by PDA was much higher than actual capacity, although I suppose that doesn't mean it's never happened.
 