3dpower
Mechanical
- Jul 8, 2013
- 4
Hello I just recently joined a company who is trying to start using PDMLink 10 (windchill). We bought the starter package from PTC with some sample data (OOTB data). I was curious if anyone has any tips, best practices, or pitfalls they could share that would benefit our deployment. We will be getting help from a third party consultant and we have reviewed some documentation via PTC's support site, but I was hoping to get some insight from people who have actually done this implementation; mainly on topics such as object type manipulation, product and library structure use, workflow customization, etc...
Company background, currently we use ProE to design models/parts of drawings, ultimately modeling a power generation turbine. We use ePDM to check in and out files and progress them through organizational workflows. Some files (legacy data) are stored in network drives as well, which we hope to archive in pdmlink. We hope to adapt to the supplied OOTB Windchill Change management process to avoid any headaches.
Thanks in advance for any input you may post.
Company background, currently we use ProE to design models/parts of drawings, ultimately modeling a power generation turbine. We use ePDM to check in and out files and progress them through organizational workflows. Some files (legacy data) are stored in network drives as well, which we hope to archive in pdmlink. We hope to adapt to the supplied OOTB Windchill Change management process to avoid any headaches.
Thanks in advance for any input you may post.