I have a set of sealed shop drawings for small steel canopy.
The PEMB engineer has provided column loading data. Our loads are small. The greatest one is 3 kips uplift; and less than 0.5 kip horizontal.
Since we designed the slab, I still want to put into the Hilti software to doublecheck.
Below is what the PEMB engineer has provided for anchor bolts.
Does anyone know what 'Bend Length' is? Embedment? (a reference to older "L-Bolts" versus hex head?)
See below:
Thank you in advance.
The PEMB engineer has provided column loading data. Our loads are small. The greatest one is 3 kips uplift; and less than 0.5 kip horizontal.
Since we designed the slab, I still want to put into the Hilti software to doublecheck.
Below is what the PEMB engineer has provided for anchor bolts.
Does anyone know what 'Bend Length' is? Embedment? (a reference to older "L-Bolts" versus hex head?)
See below:
Thank you in advance.