diegotorres1
Structural
- Sep 11, 2018
- 11
Hello colleagues, I am a EIT and i have been put to a task on getting some preliminary design for a project. i was wondering if anyone has had to select a company to design a PEMB before. From my experience, it has been the architect's job to do so. The purpose of the building is a storage unit that is 110'x55' and 25' tall. Is it possible to get a preliminary design from them to pass down to the client and make sure this is something he agrees on? we have a very quick time frame for this.