Dear Friends
In an ASME VIII DIV 1 vessel which PWHT and Hydrotest have been done on that, it needs Internal ANODES to be installed with fillet weld. As this is a non-pressure item, the following concerns may be caused:
1- Is it necessary to perform SPOT PWHT on the support?
2- Is it necessary to perform Hydrotest after welding?
AS you all know ASME VIII stated that “A hydrostatic test shall be conducted on all vessels after all fabrication has been completed,……”.
It would be my pleasure to read all your helpful comments.
Thank you in advance.
In an ASME VIII DIV 1 vessel which PWHT and Hydrotest have been done on that, it needs Internal ANODES to be installed with fillet weld. As this is a non-pressure item, the following concerns may be caused:
1- Is it necessary to perform SPOT PWHT on the support?
2- Is it necessary to perform Hydrotest after welding?
AS you all know ASME VIII stated that “A hydrostatic test shall be conducted on all vessels after all fabrication has been completed,……”.
It would be my pleasure to read all your helpful comments.
Thank you in advance.