yk052052
Electrical
- Mar 16, 2016
- 14
We've got connection as following in our substation.
6/0.4kV Transformer (N is grounded) -----------BUS BAR(U/V/W/N)-------------LV Switchgear
And our system's Neutral is grounded.
In SWGR A side, all voltage measurement is OK.
But we have some problem on voltage measured from SWGR B Side.
L1 - L2 : 400V
L2 - L3 : 400V
L3 - L1 : 400V
N - L1 : 230V
N - L2 : 230V
N - L3 : 230V
GND - N : 230V
GND - L1 : 400V
GND - L2 : 0V
GND - L3 : 400V
GND(SWGR A) - GND(SWGR B) : 0V
We're in very urgent situation since P.T (that is supposed to be supply with 230V) is now supplied by 400V. (GND - L1&L3 : 400V)
If we have any damage on P.T, then our system will shutdown.
Can you give any possible reasons and what we have to try to solve this?
For now I can't understand this voltages measured.
6/0.4kV Transformer (N is grounded) -----------BUS BAR(U/V/W/N)-------------LV Switchgear
And our system's Neutral is grounded.
In SWGR A side, all voltage measurement is OK.
But we have some problem on voltage measured from SWGR B Side.
L1 - L2 : 400V
L2 - L3 : 400V
L3 - L1 : 400V
N - L1 : 230V
N - L2 : 230V
N - L3 : 230V
GND - N : 230V
GND - L1 : 400V
GND - L2 : 0V
GND - L3 : 400V
GND(SWGR A) - GND(SWGR B) : 0V
We're in very urgent situation since P.T (that is supposed to be supply with 230V) is now supplied by 400V. (GND - L1&L3 : 400V)
If we have any damage on P.T, then our system will shutdown.
Can you give any possible reasons and what we have to try to solve this?
For now I can't understand this voltages measured.