i have been working on a pile foundations,
I need to know what will be minimum time required for curing of concrete before
commencement of following works after piling,
1.pile breaking to cut off level.
2. pile intergrity test
3. pile cap & pedastal concreting.
4. form work removal.
5. pile cap loading with column.
Please let me know also the code which specifies these minimum curing time.