Hi all, I am currently trying to follow the online tutorial for the SAP2000 Automated Seismic Design of Bridges, and when it gets to the Pile foundations it barely discusses how they modeled it...
If any of you can point me in the right direction please do so, or if you can answer these next few questions please do.
In the tutorial, it says to apply a weld constraint to the bottom of the column to the center of the planer object. Which I have tried but once I try to attach the piles to the same planer object at the same point I loose one or the other constraints. i.e. once I run the model either the column is free from the pile cap or the pile is free.
Which constraints should I use to attach the piles to the pile cap?
How should I model the pile cap?
Thanks
If any of you can point me in the right direction please do so, or if you can answer these next few questions please do.
In the tutorial, it says to apply a weld constraint to the bottom of the column to the center of the planer object. Which I have tried but once I try to attach the piles to the same planer object at the same point I loose one or the other constraints. i.e. once I run the model either the column is free from the pile cap or the pile is free.
Which constraints should I use to attach the piles to the pile cap?
How should I model the pile cap?
Thanks