Dear All,
Does anybody have records on pile installation productivity? I would like to know the average installation per driving unit per day, both of precast piles and expanded bottom piles (reinforced), compaction type.
Soil is silty sandy, approximate pile diameter 0.4m x 20.0m lg.
Thank you for the help,
Does anybody have records on pile installation productivity? I would like to know the average installation per driving unit per day, both of precast piles and expanded bottom piles (reinforced), compaction type.
Soil is silty sandy, approximate pile diameter 0.4m x 20.0m lg.
Thank you for the help,