waytsh
Structural
- Jun 10, 2004
- 373
Simple question. (Or maybe not) Is it acceptable to have an auger cast pile that is not "sunk" into the base slab but merely connected to the base slab via hooked rebar? Do any of the codes prohibit a flush connection when both components are cast in place?