Concept design is for a secant piled wall to construct a seawater intake structure on an offshore reclaimed island. bored cast in situ piling is prevalent in the region and more importantly the equipment is available at the remote site.
Contractor is unable at this time to provide a detailed methodology for how he will cast the piles in the area of the island revetments consisting of armour rock underlain by quarry run cobble-boulders.
His latest proposal is to insert a geomembrane inside the temporary casing before pulling the casing. I cant find anyone who has come across this approach and am asking the contractor for detailed MS and case histories. I wondered if any peers on here had experience of this or had alternative approaches.
We have constructed steel tube grouted piles for bridge foundations elsewhere on the island however this required specialist equipment and wouldn't be suitable where we're looking to construct the secant pile wall.
TIA
Contractor is unable at this time to provide a detailed methodology for how he will cast the piles in the area of the island revetments consisting of armour rock underlain by quarry run cobble-boulders.
His latest proposal is to insert a geomembrane inside the temporary casing before pulling the casing. I cant find anyone who has come across this approach and am asking the contractor for detailed MS and case histories. I wondered if any peers on here had experience of this or had alternative approaches.
We have constructed steel tube grouted piles for bridge foundations elsewhere on the island however this required specialist equipment and wouldn't be suitable where we're looking to construct the secant pile wall.
TIA