GMCM
Bioengineer
- Oct 1, 2019
- 6
I am designing a bulkwall for a 42'' hdpe pipe. The pipe is to be abandoned in place via grout fill, hence the need for a bulkwall. Anyone know of any sizing equations and/or standards that I should be aware of? I have been looking at bulkwall design standards from the US Bureau of Mines Information, but this is likely not the best reference for information in my case. Appreciate the help.