rudiawan .
Petroleum
- Jun 28, 2017
- 41
i have a project which will using 4 pumps running parallel, the capacity for each pump is 500 m3/hr
the pump will supply the water to the header and then goes to pipeline.
my question is why my client request to use the pipe size of header , 1 size bigger than the pipeline, even tough as per calculation, velocity still on the range
thanks in advance
the pump will supply the water to the header and then goes to pipeline.
my question is why my client request to use the pipe size of header , 1 size bigger than the pipeline, even tough as per calculation, velocity still on the range
thanks in advance