texeng88
Structural
- Jan 31, 2012
- 5
I work in the energy and chemicals industry and have been thrown into the position of a lead engineer on a few small projects due to my office being understaffed. I am still trying to learn the typical workflow of these types of projects and was hoping someone has some experience with pipe racks and supports. The way I have been working so far is for have the piping designer to put some temporary steel supports in his 3d model where he will need them, and then I will get into his model and look at his support layout at elevations and actually design the supports. Is this the standard workflow that projects typically follow?