dakota99
Structural
- Feb 23, 2005
- 21
A project is under constuction now where I orginally detailed all under slab plumbing pipes to be sleeved into either the foundation wall or the wall footing, depending on the I.E. of the pipe. now that all of the footings are poured it turns out that many of the pipes will now pass under the wall footings at 90 dergree angles. do I still need to provide a sleeve for this pipe? The pipe is PVC and will vary in size from 4"-12" and vary between 4' and just a few inches below the bottom of the wall footing. if a sleeve is requried, where can I find a detail of what this should look like?