We currently need to price up replacing some 400 DN stainless steel pipework and a vessel. I have a few questions though if you dont mind. There is plenty of steel work available to weld on some lugs for the rigging but when the stainless is lifted in place how are you supposed to stabalise it to tack weld it in place?
Also we will have to lift the stainless vessel vertically. How do you go about this from a rigging point of view? The tank is around 5/6 tonnes.