durtaholic
Civil/Environmental
- Jul 4, 2011
- 18
Have a situation where as a technician am not looking at the bottom of trench excavations full time . Have residual water from existing system draining into trench as new 8" pvc is being installed. Contractor has made some effort to pump water out and place 3/4" gravel in bottom in spots. Then placing 12" of sand over pipe. Spec calls for 95% at top of pipe zone. (+1 over T.O.P.) They tried running a small vibra plate over sand with no luck . Suggestion was made to use hand tamper on sides of pipe but they do not want to do this. In areas were we did observe the gravel go on bottom they were able to place approximately 12" of processed base material over sand and compact with sheep foot wheel. We would dig back to sand and were getting decent tests. The sand is a dirty sand with 17% - 2oo. Now we have an area where we can not get above 87 % on sand. Just wondering if anyone has any ideas to get that pipe zone area compacted, and is it possible that the material under the pipe is crap causing a problem getting compaction ? Also, has anyone used that method of placing a lift of agg base over sand and compacting that in an effort to compact sand underneath ? Thanks for any help in advance .. BG