Greetings. My team is working on a project to make a branch connection on a 16" natural gas pipeline. For the execution, we need to depressurize 15 kilometers pipeline. This will be done with a 2" pipeline that is connected to flare. I need to roughly estimate the time required for this task. It does not need to be highly accurate, a good approximation will be enough. I have never done this kind of depressurization calculation before and honestly I am not finding many references. Please guide me on which co-relations to use, or which reference to use. Thank you for your time.