Hi everyone,
I'm involve in the design of 35 km process water pipeline with 3 pump station, but I have a question about the code that I should use in the design. The major part of the pipeline will be next to a operation road (no public road) and therefore many people will pass for this road, so I have the doubt if I use the ASME B 31.3 for this fact or use ASME b31.4 because it's a pipeline between pump stations. Obviously for the pump stations i will use ASME B31.3, but 100 meters before and after (battery limit between codes) the pump stations I do not know what code to use. So i will appreciate your recommendation about this.
Thanks,
César
I'm involve in the design of 35 km process water pipeline with 3 pump station, but I have a question about the code that I should use in the design. The major part of the pipeline will be next to a operation road (no public road) and therefore many people will pass for this road, so I have the doubt if I use the ASME B 31.3 for this fact or use ASME b31.4 because it's a pipeline between pump stations. Obviously for the pump stations i will use ASME B31.3, but 100 meters before and after (battery limit between codes) the pump stations I do not know what code to use. So i will appreciate your recommendation about this.
Thanks,
César