Pipeline over Muskeg

Status
Not open for further replies.

EITGeotechnical

Geotechnical
Jun 13, 2013
5
We have a 30 inch pipe in a trench base between 5 & 6 m deep for a stretch approximately 300 m in length. Muskeg encounter at around 4.5 m ( i.e 0.5 to 1 m above design elevation). The area above the pipe is supposed to be a lay-down with light or moderate traffic. The area had been under regular traffic for over 6 month (i.e short term consolidation).

Please advise of what is the best recommendation to stabilize the base of the trench.
 
Replies continue below

Recommended for you

How thick is the muskeg? Is it amorphous or fibrous? What is above the muskeg as you indicate it is 4.5 m deep - a fill? Some important questions to consider.
 
The muskeg thickness between 0.5 to 1.5 m, It is fibrous muskeg. Sand some gravel used to be above the muskeg for more than 6 month.

Thanks BigH!
 