EITGeotechnical
Geotechnical
- Jun 13, 2013
- 5
We have a 30 inch pipe in a trench base between 5 & 6 m deep for a stretch approximately 300 m in length. Muskeg encounter at around 4.5 m ( i.e 0.5 to 1 m above design elevation). The area above the pipe is supposed to be a lay-down with light or moderate traffic. The area had been under regular traffic for over 6 month (i.e short term consolidation).
Please advise of what is the best recommendation to stabilize the base of the trench.
Please advise of what is the best recommendation to stabilize the base of the trench.