Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Plate or Box Tube for WPS Qualification.

Status
Not open for further replies.

Illuminasa

Materials
Mar 18, 2013
1
There are 2 weldments a) Box Tube join to a Flat Plate such as Fig 4.29 of AWS D1.1 and b) Joining 2 Box Tube together such as Figure 4.8

I have a existing WPS that uses Plate for qualification test. Assumming that all thickness to be .25in and position to be 1G and 2G. Do I still need new WPS for a) and b)? Is my existing WPS good enough?

 
Replies continue below

Recommended for you

See Table 4.1 "WPS Qualification - Production Welding Positions Qualified by Plate, Pipe, and Box Tube Tests".
 
You need to qualify a new WPS. Box tubing WPS qualification requires qualification to tubular connections the macro-etch samples and such as listed in AWS D1.1 if a T-Y-K connection is involved. Also is the joint CJP or PJP in production and in what configuration. It could be a T-Y-K connection if the box tubing is joined at any angle other than a butt joint.

With more information, I am glad to help.
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor