Hey guys
I'm working on a project where they will be lifting an HVAC unit and moving it into the building through a louver. The roof is not flat - we need to design a platform to take the load from the unit/workers. Attached are pdf sketches showing what will be done. Will what we have in mind be stable enough? Nothing has been designed, just the concept. So beams will be spanning/resting on the louver opening and on the stair tower (not built yet). Beams will be secured using c-clamps on both sides. Over the beams will be OSHA planks.
I appreciate any input!
I'm working on a project where they will be lifting an HVAC unit and moving it into the building through a louver. The roof is not flat - we need to design a platform to take the load from the unit/workers. Attached are pdf sketches showing what will be done. Will what we have in mind be stable enough? Nothing has been designed, just the concept. So beams will be spanning/resting on the louver opening and on the stair tower (not built yet). Beams will be secured using c-clamps on both sides. Over the beams will be OSHA planks.
I appreciate any input!