JHJHKim82
Geotechnical
- Jan 19, 2016
- 1
Modeling contains a Box culvert beside pile and raft foundation.
(Plaxis 3d Foundation v1.6)
Piles and raft foundation is constructed by Sheet Pile method.
Soil is very soft clay (SPT N<1)
So, before excavation, Ground modification is needed.
Anyway, I did my best, Modeling completed,
....but I think something wrong.
"Error in iterative solver.
Preconditined conjuagte gradients converges very slow.
Use direct solver instead of iterative"
This message appears again and again. (Excavation phase)
How? can I do this right?
I changed iteration option or something, but nothing's changed.
Im desperate. Help me. Please.
If you want (anyone), I'll send my modeling file.
(Plaxis 3d Foundation v1.6)
Piles and raft foundation is constructed by Sheet Pile method.
Soil is very soft clay (SPT N<1)
So, before excavation, Ground modification is needed.
Anyway, I did my best, Modeling completed,
....but I think something wrong.
"Error in iterative solver.
Preconditined conjuagte gradients converges very slow.
Use direct solver instead of iterative"
This message appears again and again. (Excavation phase)
How? can I do this right?
I changed iteration option or something, but nothing's changed.
Im desperate. Help me. Please.
If you want (anyone), I'll send my modeling file.