Hello to everyone
I´ve just started to work with PLS CADD, I´m having a little bit of trouble, and I´d be really grateful if someone could give me a hand.
I have got cartography, towers´ models, described extra-cost & prohibited zones and already defined criteria
and now I´m trying to use Optimum Spotting. We are simulating a double circuit line but when I run simulation
I can just get a simple circuit, no fibre line and no grounding cable.
What am I doing wrong? Because to simulate optimum spotting assigning differents towers it has got to take into
account 2 circuit and fibre´s forces. Hasn´t it?
Thanks a lot
I´ve just started to work with PLS CADD, I´m having a little bit of trouble, and I´d be really grateful if someone could give me a hand.
I have got cartography, towers´ models, described extra-cost & prohibited zones and already defined criteria
and now I´m trying to use Optimum Spotting. We are simulating a double circuit line but when I run simulation
I can just get a simple circuit, no fibre line and no grounding cable.
What am I doing wrong? Because to simulate optimum spotting assigning differents towers it has got to take into
account 2 circuit and fibre´s forces. Hasn´t it?
Thanks a lot