E Ward
Structural
- Aug 22, 2023
- 2
I have a building going up that has mostly 24" oc rafter spacing. because of the span, one section / plane, of the roof has an increase in LVL size from 1 2/4"x12 to 1 3/4x14, with a decrease in the spacing to 16"oc. The sheeting that has been spaced is 3/4" osb or plywood for the whole job. I have a stockplie of 5 ply 5/8" plywood that has no span index stamped that is readable. Can this material be used for the sheeting? My engineer, who happens to be the plan checker for the County is on vacation until the first of Sept. I'd like to get the roof sheeted before that. Any help?
Thanks, Eric