ivanga7
Civil/Environmental
- May 20, 2016
- 40
Hi, I am designing a pole footing where the dead load is not sufficient to resist the uplift created by wind. Is there a provision in the code that gives soil friction values to resist the uplift? There is no geotech involved in this project.