As per the HydroCAD Owner's Manual, pond routing assumes basically a "zero-velocity level pool" and "If the velocity approaching the outlet device(s) is significant, pond routing may underestimate the discharge and overestimate the peak elevation and storage of the pond.".
Questions:
1. What would be defined as "significant"?
2. If I modeled pipes (closed drainage) as ponds, wouldn't they all fall within the above statement?
Questions:
1. What would be defined as "significant"?
2. If I modeled pipes (closed drainage) as ponds, wouldn't they all fall within the above statement?