bjb
Structural
- Nov 8, 2002
- 455
what kind of allowance should be made for additional concrete as the metal deck deflects when the concrete is poured? The kind of floor I'm talking about has steel beams, metal floor deck and concrete fill. It's been a while, but I seem to remember allowing for an additional 5 psf of dead load due to ponding concrete.