I'm having trouble figuring out how to produce these numbers and then apply them to the plan view.
I made a profile view of the existing street section. It is a 1525' straight strech of roadway. The existing flow line is at a .25% grade. The new FL will be .9% for 200' then is will decrease to -.4% with a 20' vertical curve in the middle. These intervals will continue for the length of the section.
I plotted these elevation changes on the plan view and constructed a 1.8' elevation conture line from the curb face. I came up with with calcs by taking the change in elevation at each station, minus the gutter elevation(.13') and then dividing by the the slope from the gutter to center line which is 2%.
The curb is .5' high, from the bottom to the lip of the concrete gutter is .13', then there is the 31.5' length to the CL at a 2% grade.
Thanks
I made a profile view of the existing street section. It is a 1525' straight strech of roadway. The existing flow line is at a .25% grade. The new FL will be .9% for 200' then is will decrease to -.4% with a 20' vertical curve in the middle. These intervals will continue for the length of the section.
I plotted these elevation changes on the plan view and constructed a 1.8' elevation conture line from the curb face. I came up with with calcs by taking the change in elevation at each station, minus the gutter elevation(.13') and then dividing by the the slope from the gutter to center line which is 2%.
The curb is .5' high, from the bottom to the lip of the concrete gutter is .13', then there is the 31.5' length to the CL at a 2% grade.