Hi,
I am designing a 30m span portal frame, 11m high. The frame has been analysed as a pinned frame. When designing the baseplate I found that due to horizontal forces I need to provide 30mm dim holding bolts. We also intend to cast the baseplates with concrete stubs.
My issue is that the plate cast in concrete will be very stiff and this will attract moments from the frame. I am concerned that due to these moments I will get a pull out failure (concrete cone failure) before steel yielding. As I have provided a large dim bolts for resiting shear they wont yield before concrete failure.
One option is to drop down the steel grade from 8.8 to 4.6 (195 N/mm2) to initiate a steel failure before concrete ,but I have always specified 8.8 grade to date so I am a bit slow to change our standard details.
Will appreciate all your advise.
Thank you
Karol