Hello all -
We're currently constructing a post-tensioned box girder bridge (3 span continuous - 31.1m - 39m - 31.1m) with 2 slanted external /5 vertical internal webwalls. The center webwall (405 mm wide) shifted out of horizontal alignment as much as 150 mm total at the top during the webwall pour(the shift is sinusoidal, with the curve amplitude split about evenly across the 125 mm displacement). Most of the shift is near the midspan of the interior span, where ducts are placed near the bottom of the box beam soffit. The paired 100mm rigid steel ducts are side by side in the location of maximum horizontal "wave". We can't tell whether the ducts have shifted as much as the top of the webwalls, although the general alignment of the webwall at the box soffit junction is fairly straight.
We are concerned that the webwall could potentially be damaged (blown out) locally upon tensioning the strands, and/or the bridge could have global serviceablity problems.
I can't find a lot on allowable horizontal tolerances for the stranding/duct layout, or potential consequences of letting the situation stand as is. We have contacted the post-tensioning subcontractor, and they are not terribly concerned by the situation after hearing the description of the problem and examining photos.
The bridge was designed by consultant, and they are reluctant (as are we) to accept the present condition without some numerical method of verifying the adequacy of the design. They have recommended that the contractor provide calculations verifying that the webwall condition will cause no problems.
We are considering having the contractor remove the misaligned webwall and repour. Both we and our consultant have some concern, though, that removing the webwall could make the situation worse. We think we could solve a local blowout problem by chipping the wall down beyond the inside face of the stemwall bars (in order to get adequate concrete around them for bond), and doweling and pouring a thickened webwall section, but have some concern that we could damage the ducts in the process.
Has anybody run up against this situation? Would chipping out the concrete webwall make conditions worse?
We're currently constructing a post-tensioned box girder bridge (3 span continuous - 31.1m - 39m - 31.1m) with 2 slanted external /5 vertical internal webwalls. The center webwall (405 mm wide) shifted out of horizontal alignment as much as 150 mm total at the top during the webwall pour(the shift is sinusoidal, with the curve amplitude split about evenly across the 125 mm displacement). Most of the shift is near the midspan of the interior span, where ducts are placed near the bottom of the box beam soffit. The paired 100mm rigid steel ducts are side by side in the location of maximum horizontal "wave". We can't tell whether the ducts have shifted as much as the top of the webwalls, although the general alignment of the webwall at the box soffit junction is fairly straight.
We are concerned that the webwall could potentially be damaged (blown out) locally upon tensioning the strands, and/or the bridge could have global serviceablity problems.
I can't find a lot on allowable horizontal tolerances for the stranding/duct layout, or potential consequences of letting the situation stand as is. We have contacted the post-tensioning subcontractor, and they are not terribly concerned by the situation after hearing the description of the problem and examining photos.
The bridge was designed by consultant, and they are reluctant (as are we) to accept the present condition without some numerical method of verifying the adequacy of the design. They have recommended that the contractor provide calculations verifying that the webwall condition will cause no problems.
We are considering having the contractor remove the misaligned webwall and repour. Both we and our consultant have some concern, though, that removing the webwall could make the situation worse. We think we could solve a local blowout problem by chipping the wall down beyond the inside face of the stemwall bars (in order to get adequate concrete around them for bond), and doweling and pouring a thickened webwall section, but have some concern that we could damage the ducts in the process.
Has anybody run up against this situation? Would chipping out the concrete webwall make conditions worse?